CBE 5230

Petroleum Drilling and Production Engineering

3credits
About this course

The design and evaluation of well drilling systems; identification and solution of drilling problems; wellbore hydraulics, well control, casing design; well cementing directional drilling, offshore drilling. Introduction to production operations and oil field equipment including onshore and offshore production systems. Prereq: 5200 and EarthSc 5661; or Grad standing; or permission of instructor.

All available terms

6 terms

Avg. GPA
3.93
Grades
120

Other grades

P0.8%
More course details

Ohio State University

CBE 5230 at Ohio State: average GPA 3.93 across 120 students. Grade distribution by term. The design and evaluation of well drilling systems; identification…

Average GPA: 3.93

Grade distribution records: 120 students across 6 terms.

Grade distribution

GradeStudentsPercent
A10688.3%
A-65.0%
B+32.5%
B32.5%
B-10.8%
P10.8%

Based on 120 student grade records across 6 terms and 1 professor.

Instructors

Related courses

The course page is taking longer to load. This summary is still available.

We could not load the full course details. This summary is still available.

Still loading. This can take a moment on a slow connection.

Loading My Class Grades