CONSYSM 3450: Estimating for Construction

Ohio State University

Reading and interpretation of construction drawings and specifications for construction projects. Estimating the material requirements and costs of building construction projects using commercially available estimating tools. Prereq: 2240, 2241, 2310, 2345, and Physics 1200 or 1250. Prereq or concur: ConSysM 2440.

Average GPA: 3.28

Grade distribution records: 531 students across 13 terms.

Grade distribution

GradeStudentsPercent
A17833.5%
A-8215.4%
B+8315.6%
B7313.7%
B-407.5%
C+295.5%
C152.8%
C-81.5%
D+40.8%
D112.1%
F81.5%

Based on 531 student grade records across 13 terms.

Still loading. This can take a moment on a slow connection.

Loading My Class Grades