Project Execution and Administration - Constructionarium United Kingdom. (3-0). Credit 3. Development of project execution and management of a mock commercial construction project; includes aspects of estimating, bidding, schedule development, real time scheduling, job-site safety plans, project execution plans, material procurement, cost controls, construction management, owner, and architect presentations, close out, and post-construction requirements; includes multiple day field trip during the mock construction project. Prerequisites: Admission to upper level in Construction Science.
1 term
Texas A&M
COSC 427 at TAMU: average GPA 4.00 across 28 students. Grade distribution by term. Project Execution and Administration - Constructionarium United Kingdom…
Average GPA: 4.00
Grade distribution records: 28 students across 1 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 28 | 100.0% |
Based on 28 student grade records across 1 term and 1 professor.
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades