Construction Project Controls. (3-0). Credit 3. Introduction to construction related financial documents including schedule of values, labor and operations cost reports, income statements, balance sheets and construction budgets; emphasis on the development of techniques required to effectively monitor the financial aspects of a construction project. Prerequisite: COSC 353 and COSC 494.
44 terms
Other grades
Texas A&M
COSC 477 at TAMU: average GPA 2.85 across 7,393 students. Grade distribution by term. Construction Project Controls. (3-0). Credit 3. Introduction to…
Average GPA: 2.85
Grade distribution records: 7,393 students across 44 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 1,591 | 21.5% |
| B | 3,353 | 45.4% |
| C | 2,156 | 29.2% |
| D | 141 | 1.9% |
| F | 80 | 1.1% |
| W | 63 | 0.9% |
Based on 7,393 student grade records across 44 terms and 6 professors.
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades