Construction Cost Estimating. (3-0). Credit 3. Determination of quantities for various types of construction materials and works including earthwork, foundations, structural systems, mechanical and electrical systems, and building finishes; methods used for pricing of construction works including labor, materials, equipment, sub-contractors, overhead and profit; use of various types of cost data catalogs available in the industry. Prerequisite: Graduate classification in the Department of Construction Science.
15 terms
Other grades
Texas A&M
COSC 602 at TAMU: average GPA 3.61 across 709 students. Grade distribution by term. Construction Cost Estimating. (3-0). Credit 3. Determination of quantities…
Average GPA: 3.61
Grade distribution records: 709 students across 15 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 484 | 68.3% |
| B | 174 | 24.5% |
| C | 37 | 5.2% |
| D | 4 | 0.6% |
| F | 3 | 0.4% |
| W | 3 | 0.4% |
Based on 709 student grade records across 15 terms and 11 professors.
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades