Construction Contract Administration and Liens . (3-0). Credit 3. Examination of the various facets of construction law and construction contract administration; contract components, types of construction contracts, subcontracts and supply contracts, design and build contracts, bidding and award of contracts, negotiation, claims and disputes, changes to the work, time and cost, correction of the work, contract completion, mechanic’s and materialmen’s liens and surety bonds.
3 terms
Other grades
Texas A&M
LAW 718 at TAMU: average GPA 3.26 across 153 students. Grade distribution by term. Construction Contract Administration and Liens . (3-0). Credit 3…
Average GPA: 3.26
Grade distribution records: 153 students across 3 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 84 | 54.9% |
| B | 36 | 23.5% |
| C | 18 | 11.8% |
| D | 6 | 3.9% |
| F | 5 | 3.3% |
| W | 4 | 2.6% |
Based on 153 student grade records across 3 terms and 2 professors.
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades