PETE 325

PETR PRODUCTION SYSTEMS

3credits
About this course

Petroleum Production Systems. (2-3). Credit 3. Petroleum operation and oil field equipment including onshore and offshore production systems; wellbore inflow and outflow and backpressure analysis; downhole completion and sand control equipment; artificial lift equipment and design; stimulation, workover/completion nomenclature; flow assurance; produced fluids, fluid separation and metering, safety systems, pressure boosting and monitoring. Prerequisites: Grade of C or better in PETE 301, PETE 310 and PETE 314.

All available terms

1 term

Avg. GPA
2.42
Grades
84
More course details

Texas A&M

PETE 325 at TAMU: average GPA 2.42 across 84 students. Grade distribution by term. Petroleum Production Systems. (2-3). Credit 3. Petroleum operation and oil…

Average GPA: 2.42

Grade distribution records: 84 students across 1 terms.

Grade distribution

GradeStudentsPercent
A67.1%
B3035.7%
C4148.8%
D78.3%

Based on 84 student grade records across 1 term and 1 professor.

Instructors

The course page is taking longer to load. This summary is still available.

We could not load the full course details. This summary is still available.

Still loading. This can take a moment on a slow connection.

Loading My Class Grades