Public and Private Infrastructure Funding. (3-0). Credit 3. An introduction to issues of financing public and public-private development project; exploring the difference between raising revenue, including the trade offs associated with establishing a sustainable tax base, and raising capital through capital markets; illustration of the range of decisions with financing public and public-private partnerships. Prerequisite: Upper division College of Architecture; URPN majors only.
1 term
Other grades
Texas A&M
URPN 331 at TAMU: average GPA 3.74 across 104 students. Grade distribution by term. Public and Private Infrastructure Funding. (3-0). Credit 3. An introduction…
Average GPA: 3.74
Grade distribution records: 104 students across 1 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 75 | 72.1% |
| B | 26 | 25.0% |
| Q | 3 | 2.9% |
Based on 104 student grade records across 1 term and 1 professor.
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades