CCE 4034: Construction Estimating and Scheduling

University of Central Florida

Construction project estimating and bidding and the preparation of construction schedules, followed by in-depth coverage of time and cost control, and risk management.

Average GPA: 2.90

Grade distribution records: 768 students across 9 terms.

Grade distribution

GradeStudentsPercent
A17222.4%
A-607.8%
B+8110.5%
B12015.6%
B-9812.8%
C+253.3%
C14118.4%
C-162.1%
D+70.9%
D324.2%
D-30.4%
F81.0%
W50.7%

Based on 768 student grade records across 9 terms and 3 professors.

Instructors

Still loading. This can take a moment on a slow connection.

Loading My Class Grades