ENCE 423

Project Planning, Estimating & Scheduling

3credits
About this course

Learn the fundamentals of project planning, estimating, and scheduling. Understand the concepts of planning; to reduce uncertainty, improve efficiency of the operation, to set and meet objectives, and to provide a basis for monitoring and controlling the work. Be introduced to: the concepts of resource definition, assignment and management, and; the basics of project estimating (pricing) methods including global pricing strategies, types of estimates, pricing processes, overhead and profit, and project financing.Learn the basics of project scheduling including; bar charts, network-based methodologies, and linear scheduling techniques. Emphasis is placed on Critical Path Method (CPM) scheduling, a network based methodology. Be exposed to the use of scheduling software and will actually develop a CPM schedule for an actual construction project as part of a semester project.

All available terms

23 terms

Avg. GPA
3.70
Grades
1,581

Other grades

W1.1%
More course details

University of Maryland

ENCE 423 at UMD: average GPA 3.70 across 1,581 students. Grade distribution by term. Learn the fundamentals of project planning, estimating, and scheduling…

Average GPA: 3.70

Grade distribution records: 1,581 students across 23 terms.

Grade distribution

GradeStudentsPercent
A+34421.8%
A66942.3%
A-1137.1%
B+1117.0%
B21913.9%
B-503.2%
C+161.0%
C211.3%
C-10.1%
W181.1%

Based on 1,581 student grade records across 23 terms and 1 professor.

Instructors

Related courses

The course page is taking longer to load. This summary is still available.

We could not load the full course details. This summary is still available.

Still loading. This can take a moment on a slow connection.

Loading My Class Grades