Project Planning Scheduling and Control --- Project planning and scheduling with arrow and precedence networks using CPM (Critical Path Method). Project control, Cost/Schedule Control Systems Criteria (C/SCSC), Earned Value Systems. Scheduling under uncertainty, PERT (Program Evaluation and Review Technique), PNET (Probabilistic Networks), simulation. Time-cost tradeoff, resource allocation, and resource leveling. Overlapping networks. RSM (Repetitive Scheduling Method).
1 term
University of Michigan, Ann Arbor
CEE 536 at UMich: average GPA 3.74 across 10 students. Grade distribution by term. Project Planning Scheduling and Control --- Project planning and scheduling…
Average GPA: 3.74
Grade distribution records: 10 students across 1 terms.
| Grade | Students | Percent |
|---|---|---|
| A+ | 1 | 10.0% |
| A | 4 | 40.0% |
| A- | 3 | 30.0% |
| B+ | 1 | 10.0% |
| B | 1 | 10.0% |
Based on 10 student grade records across 1 term and 1 professor.
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades