CEE 536

Proj Pln Sched&Cntrl

3credits
About this course

Project Planning Scheduling and Control --- Project planning and scheduling with arrow and precedence networks using CPM (Critical Path Method). Project control, Cost/Schedule Control Systems Criteria (C/SCSC), Earned Value Systems. Scheduling under uncertainty, PERT (Program Evaluation and Review Technique), PNET (Probabilistic Networks), simulation. Time-cost tradeoff, resource allocation, and resource leveling. Overlapping networks. RSM (Repetitive Scheduling Method).

All available terms

1 term

Avg. GPA
3.74
Grades
10
More course details

University of Michigan, Ann Arbor

CEE 536 at UMich: average GPA 3.74 across 10 students. Grade distribution by term. Project Planning Scheduling and Control --- Project planning and scheduling…

Average GPA: 3.74

Grade distribution records: 10 students across 1 terms.

Grade distribution

GradeStudentsPercent
A+110.0%
A440.0%
A-330.0%
B+110.0%
B110.0%

Based on 10 student grade records across 1 term and 1 professor.

Instructors

Related courses

The course page is taking longer to load. This summary is still available.

We could not load the full course details. This summary is still available.

Still loading. This can take a moment on a slow connection.

Loading My Class Grades