CMET 3123: Cost Estimating

University of North Carolina, Charlotte

Methods used to prepare construction cost estimates, engineer production and cost, and determine labor and equipment resources.

Average GPA: 2.44

Grade distribution records: 651 students across 20 terms.

Grade distribution

GradeStudentsPercent
A10716.4%
B22634.7%
C16625.5%
D7010.8%
F487.4%
W162.5%

Based on 651 student grade records across 20 terms and 5 professors.

Instructors

Still loading. This can take a moment on a slow connection.

Loading My Class Grades