Methods for planning, scheduling, and controlling construction projects, emphasizing manual and computer based techniques for critical path method scheduling, resource management, construction cost control, and reporting practices.
11 terms
Other grades
University of North Carolina, Charlotte
CMET 4126 at UNC Charlotte: average GPA 2.78 across 513 students. Grade distribution by term. Methods for planning, scheduling, and controlling construction…
Average GPA: 2.78
Grade distribution records: 513 students across 11 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 121 | 23.6% |
| B | 215 | 41.9% |
| C | 113 | 22.0% |
| D | 33 | 6.4% |
| F | 17 | 3.3% |
| W | 9 | 1.8% |
Based on 513 student grade records across 11 terms and 6 professors.
Related topic in CMET
Related topic in CMET
Related topic in CMET
Also in CMET
Also in CMET
Also in CMET
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades