Advanced methods for planning and controlling construction projects. Specific topics of study include resource allocation, leveling and management, critical path method (CPM) and project evaluation and review techniques (PERT) of scheduling, project controls through cost-schedule integration, and schedule compression. Section information text: 100% online course delivered using Canvas. Learn to use Canvas at http://canvas.uncc.edu. This course is restricted to Charlotte Online Programs, Master's in Construction & Facilities Engineering students. Other registration questions, contact: [email protected]. RFP Development, Response, and Procurement
11 terms
Other grades
University of North Carolina, Charlotte
CMET 6135 at UNC Charlotte: average GPA 3.72 across 257 students. Grade distribution by term. Advanced methods for planning and controlling construction…
Average GPA: 3.72
Grade distribution records: 257 students across 11 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 189 | 73.5% |
| B | 57 | 22.2% |
| C | 7 | 2.7% |
| W | 2 | 0.8% |
Based on 257 student grade records across 11 terms and 4 professors.
Related topic in CMET
Related topic in CMET
Related topic in CMET
Related topic in CMET
Related topic in CMET
Related topic in CMET
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades