CEE 472

Construction Estimating

3credits
About this course

Principles and procedures used in estimating construction costs. Application of quantity determination, estimate pricing, specifications, subcontractor and supplier solicitation, risk assessment and risk analysis, and final bidding preparation. Computer-based estimating used for semester project. Crosslisted with CEM 651 and CEE 672. Credit at the 600-level requires additional work.

All available terms

1 term

Avg. GPA
No letter GPA
Grades
0

No letter grades for this term.

More course details

University of Nevada, Las Vegas

Reviews, study tips, and grade data for CEE 472 at UNLV. Principles and procedures used in estimating construction costs. Application of quantity…

Related courses

The course page is taking longer to load. This summary is still available.

We could not load the full course details. This summary is still available.

Still loading. This can take a moment on a slow connection.

Loading My Class Grades