Principles and procedures used in estimating construction costs. Application of quantity determination, estimate pricing, specifications, subcontractor and supplier solicitation, risk assessment and risk analysis, and final bidding preparation. Computer-based estimating used for semester project. Crosslisted with CEM 651 and CEE 672. Credit at the 600-level requires additional work.
1 term
No letter grades for this term.
University of Nevada, Las Vegas
Reviews, study tips, and grade data for CEE 472 at UNLV. Principles and procedures used in estimating construction costs. Application of quantity…
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades