CEM 452

Construction Cost Control

3credits
About this course

Construction cost management including productivity and cost reporting/analysis concepts. Financial/cost issues/cash flow for the construction firm including reporting methods with percentage of completion techniques. Performance/profitability enhancement. Earned value management. Construction bonding and insurance issues. Firm and jobsite analysis. Case studies.

All available terms

8 terms

Avg. GPA
3.13
Grades
124

Other grades

W0.8%
More course details

University of Nevada, Las Vegas

CEM 452 at UNLV: average GPA 3.13 across 124 students. Grade distribution by term. Construction cost management including productivity and cost…

Average GPA: 3.13

Grade distribution records: 124 students across 8 terms.

Grade distribution

GradeStudentsPercent
A3528.2%
A-97.3%
B+75.6%
B4536.3%
C+10.8%
C2419.4%
F10.8%
W10.8%

Based on 124 student grade records across 8 terms and 3 professors.

Instructors

Related courses

The course page is taking longer to load. This summary is still available.

We could not load the full course details. This summary is still available.

Still loading. This can take a moment on a slow connection.

Loading My Class Grades