Construction cost management including productivity and cost reporting/analysis concepts. Financial/cost issues/cash flow for the construction firm including reporting methods with percentage of completion techniques. Performance/profitability enhancement. Earned value management. Construction bonding and insurance issues. Firm and jobsite analysis. Case studies.
8 terms
Other grades
University of Nevada, Las Vegas
CEM 452 at UNLV: average GPA 3.13 across 124 students. Grade distribution by term. Construction cost management including productivity and cost…
Average GPA: 3.13
Grade distribution records: 124 students across 8 terms.
| Grade | Students | Percent |
|---|---|---|
| A | 35 | 28.2% |
| A- | 9 | 7.3% |
| B+ | 7 | 5.6% |
| B | 45 | 36.3% |
| C+ | 1 | 0.8% |
| C | 24 | 19.4% |
| F | 1 | 0.8% |
| W | 1 | 0.8% |
Based on 124 student grade records across 8 terms and 3 professors.
Related topic in CEM
Related topic in CEM
Related topic in CEM
Related topic in CEM
Related topic in CEM
Related topic in CEM
The course page is taking longer to load. This summary is still available.
We could not load the full course details. This summary is still available.
Still loading. This can take a moment on a slow connection.
Loading My Class Grades